Gully Stabilisation & Soil Conservation Case Study
In January 2013, excessive rain from ex-cyclone Oswald—800mm over 20 hours—triggered massive flooding in areas higher than previously seen. The rain event caused major structural damage to fencing and water infrastructure, as well as land degradation through erosion.