Rock chute case study


Raglan Station Gully Erosion Project

Raglan Station is a 16,919 hectare property sharing frontage onto Raglan Creek, a tributary flowing directly into the Fitzroy Delta. A highly erosive gully was present on the property, measuring depths of up to 10 metres and widths of up to 20 metres in some areas. The entire length of the gullied area spanned 241 metres. Fitzroy Basin Association Inc. (FBA), with funding through the Australian Government’s Reef Trust II Program, undertook a three-pronged approach to addressing gully erosion in the latter months of 2018.