Building Resilience – Cyclone Flood Recovery


Building Resilience - Ex-tropical Cyclone Oswald Flood Recovery

In January 2013, excessive rain from Ex-Tropical Cyclone Oswald—800mm over 20 hours—triggered massive flooding in areas, higher than previously seen. The rain event caused major structural damage to fencing and water infrastructure, as well as land degradation through erosion. Recovery work was completed through funding from the Queensland Government's Natural Disaster Relief and Recovery Arrangements: Ex-Tropical Cyclone Oswald On-farm Productivity and Riparian Restoration Program. FBA and our local delivery partners FRCC and DCCA, worked with landholders in the worst affected areas to repair the damage. On-ground restoration activities included streambank stabilisation and riparian restoration; gully stabilisation and soil conservation; and farm infrastructure restoration. The program also supported and promoted on-farm productivity, and enhanced local landscape, waterway and ecosystem capacity, and resilience to manage the impacts of future events.


Open Link


[ Back to top ]

Fourth “Call to Action” goes here

Events

See all

Beef Week 2024

Beef Australia exists for the advancement of the Australian beef […]

May 05 2024

Theodore Show

For more information on the Theodore Show, please follow the […]

May 15 2024

Paradise Lagoons Campdraft

The event held just 15km from the heart of Rockhampton, […]

May 16 2024

Copyright © 2024 Fitzroy Basin Association | Disclaimer | Back to top